×

Log In

Need an RMI account? Create an account

Register With Us

Already have an account?

*required fields

The password must meet the following criteria:

  • At least 8 characters
  • At least 1 lowercase letter
  • At least 1 uppercase letter
  • At least 1 number
  • At least 1 symbol (allowed symbols: !?@#$%^&/*()[]{}><,.+-=;)

Keep up to date with information about our latest climbs by joining our mailing list. Sign up and we'll keep you informed about new adventures, special offers, competitions, and news.
Privacy Policy

×
×

Check Availability

RMI Logo

Kilimanjaro: Tucker & Team Climb Barranco Wall, Ascend to Karanga Camp

We are experiencing a bit of wet weather, a cloud mist almost rain here at Karanga camp 13,000' on Kilimanjaro. We did not let the weather spoil the climb today for it held off until we arrived at camp. The infamous Barranco Wall would not have been as much fun this morning had it been wet but with perfect conditions and a strong team we cruised up the wall in about 30 minutes first thing this morning. After a couple more stretches on the trail, we arrived to a great lunch as usual with camp all set upon arrival. What a nice way to rough it! The team is resting now in our tents until the next meal. All is well here on Kilimanjaro. RMI Guide Mark Tucker

On The Map


Leave a comment for the team

* required fields

More to Explore

Denali Expedition: Haugen & Team Have Smooth Start

June 15, 2017

Alaska Alpine Seminar: Elias Recaps their time in Little Switzerland

June 16, 2017

Filter By:

Sign up for Expedition Dispatches

check the Summit Registry try our Adventure Finder
Back to Top

Sign up for our Newsletter

Image of Mt Rainier
*required fields

Email Preferences