Alpamayo: Schellens & Team Move to High Camp
Today was a big day, we loaded our packs and dawned our climbing equipment and walked away from Moraine camp. Once on the glacier we slowly worked our way around crevasses as we worked upward to the col. About 800 feet shy of the col we encountered to first of the three steeper pitches which the team dispatched with no problems. Everyone climbed very well and just before 3 pm we were all at our high camp. This is also where we caught our first glimpse of the face we will climb. We settled into our tents for a quick nap before tea time and then dinner. As Alpamayo caught the alpenglow of the last light of the day we retired to our sleeping bags, tired but very happy.
Tomorrow we rest before we make our summit attempt the following day.
RMI Guide Geoff Schellens & Team
×
Sign Up For Peru Seminar 2016 Emails
{/exp:mailinglist:form}More to Explore
Mt. Rainier: July 28th Summit!
July 28, 2016