×

Log In

Need an RMI account? Create an account

Register With Us

Already have an account?

*required fields

The password must meet the following criteria:

  • At least 8 characters
  • At least 1 lowercase letter
  • At least 1 uppercase letter
  • At least 1 number
  • At least 1 symbol (allowed symbols: !?@#$%^&/*()[]{}><,.+-=;)

Keep up to date with information about our latest climbs by joining our mailing list. Sign up and we'll keep you informed about new adventures, special offers, competitions, and news.
Privacy Policy

×
×

Check Availability

RMI Logo

Mt. Rainier: June 22nd Summit

RMI Guide JJ Justman and the Four Day Summit Climb team reached Columbia Crest, the highest point on Mt. Rainier around 7 am this morning. The team is enjoying beautiful weather with 10mph winds. They will spend some time on the summit before beginning their descent to Camp Muir. The team will return to Ashford this afternoon. Congratulations climbers!

Comments (2)

Go Miki!!!!  I can’t wait to see your pictures.  You got this girl!!!  Love you!

Posted by: Christine on

Matthew, Aaron, & Stephen—Congratulations take many pictures and have a safe trip down.  Love Dad

Posted by: Michael Brown on

Leave a comment for the team

* required fields

More to Explore

Mt. McKinley: Beren & Team Trip Complete

June 21, 2015

Mt. McKinley: Nugent & Team Celebrate Father’s Day at 11,200’

June 22, 2015

Filter By:

Sign up for Expedition Dispatches

check the Summit Registry try our Adventure Finder
Back to Top

Sign up for our Newsletter

Image of Mt Rainier
*required fields

Email Preferences