×

Log In

Need an RMI account? Create an account

Register With Us

Already have an account?

*required fields

The password must meet the following criteria:

  • At least 8 characters
  • At least 1 lowercase letter
  • At least 1 uppercase letter
  • At least 1 number
  • At least 1 symbol (allowed symbols: !?@#$%^&/*()[]{}><,.+-=;)

Keep up to date with information about our latest climbs by joining our mailing list. Sign up and we'll keep you informed about new adventures, special offers, competitions, and news.
Privacy Policy

×
×

Check Availability

RMI Logo

Mt. Everest: Hahn & Team Reach Pheriche

The RMI Everest climbing team reached Pheriche today. Our last evening and morning down in the trees of Deboche went well enough and everybody was feeling strong and in good spirits this morning. We set out in bright sunshine with a big blue sky at 8:30 AM. Yesterday, in traveling the same trail to reach Pangboche we ended up in a huge yak traffic jam where a steel truss bridge had recently collapsed into the river and a detour needed to be negotiated. Today, the yaks were elsewhere and the trail was blissfully quiet. We made pretty good time, cruising along above the North bank of the Imja Khosi while steadily gaining altitude. The trees were pretty much played out a little above Pangboche at perhaps 13,500 ft and the character of the terrain changed. We took several short breaks alongside the trail and arrived by noon at Pheriche at 14,000 ft. Our tea house for the night (and tomorrow night as well) is quite popular, "modern" and spacious... a bit of a contrast from the more low key and traditional place we stayed in at Deboche. There are at least 75 other people sharing the dining hall and lodge, some are climbers and guides that we know from other mountains, some are trekkers, many are climbing sherpas. We were all happy to be sitting around a warm stove, indoors, as the clouds rolled in and it got nasty and cold in the late afternoon. It is far too many people for the capacity of the WiFi system, but we are plenty happy to be connected again at any speed. Best Regards, RMI Guide Dave Hahn

On The Map


Comments (5)

Hi Nicole LoBiondo and team
Thank Dave for the great Blogs,  We wait each day for his exciting update.  You are very special.  Love you Mimi

Posted by: Marianne Rhodes on

Nicole, this is so exciting to read everyday. Everyone is thinking about you, your dad, brothers, cousins and Alexa has been following the blog too. GM

Posted by: Ginny Marasco on

GREAT JOB NICOLE 965948KEEP THE MOTIVATION!

PJ

Posted by: PJ KIERNAN on

Nicole Lobiondo: Doing great!!! Keep on trekking. Watch out for the yaks! Nicole

Posted by: Nicole Howard on

So cool!!!

Posted by: Fred Klingbeil on

Leave a comment for the team

* required fields

More to Explore

Everest Base Camp Trek: Tucker & Team Check in from Base Camp

April 1, 2014

Mt. Everest: Hahn & Team Greeted by Specatular Views on Pheriche Rest Day

April 2, 2014

Filter By:

Sign up for Expedition Dispatches

check the Summit Registry try our Adventure Finder
Back to Top