×

Log In

Need an RMI account? Create an account

Register With Us

Already have an account?

*required fields

The password must meet the following criteria:

  • At least 8 characters
  • At least 1 lowercase letter
  • At least 1 uppercase letter
  • At least 1 number
  • At least 1 symbol (allowed symbols: !?@#$%^&/*()[]{}><,.+-=;)

Keep up to date with information about our latest climbs by joining our mailing list. Sign up and we'll keep you informed about new adventures, special offers, competitions, and news.
Privacy Policy

×
×

Check Availability

RMI Logo

Mt. Rainier: September 1, 2013

The Four Day Summit Climb led by RMI Guides Tyler Reid and Garrett Stevens made the prudent decision to call 11,200' the team's high point after encountering firm, icy conditions. The team is making its way across the Cowlitz Glacier towards Camp Muir. Once back at Camp Muir, everyone will refuel, rest, and repack for the descent back to Paradise. We look forward to seeing the team back in Ashford early this afternoon.

Comments (4)

Kathy and Michelle,  Even though the weather didn’t cooperate, I couldn’t be prouder of my two sisters!  Love, Tamra

Posted by: Tamra on

Michelle,
  This looks so spectacular! Enjoy the rest of your time in Seattle, cant wait to hear all about it. Love Trish

Posted by: Trish Moss on

Dear Michelle and Family
You still touched the sky! I am sure that you also held intimate and rare beauty!
Love, Maura

Posted by: Maura on

Michelle & Kathy - Sorry about the conditions. What a great way to honor your parents. See you at Redhook!

Dave

Posted by: Dave on

Leave a comment for the team

* required fields

More to Explore

Mt. Elbrus: Waterfall & Team Hit by a Weather Storm

August 31, 2013

Mt. Elbrus: Waterfall & Team One Last Shot for the Summit

September 1, 2013

Filter By:

Sign up for Expedition Dispatches

check the Summit Registry try our Adventure Finder
Back to Top

Sign up for our Newsletter

Image of Mt Rainier
*required fields

Email Preferences